Customer testimonials

“Thanks to QR Drum, we saved around 5% on cable costs. For our project, this represents savings of between €1.5 and €2 million.”

“QR Drum has strengthened the credibility of departmental cable drum initiatives, ensuring better allocation of public funds. An efficient and reliable solution.”

Thomas Cantin
Director of Digital development at department Council of Ariège

A Secure and Controlled Deployment

Project Context

The Ariège Very High Speed ​​Broadband (FTTH) project aims to deploy optical fibre cable in the department. Given the investments made, it was crucial to optimise cable order management, hence, improving inventory reliability and avoiding waste.

Home connected
0
Construction sites
0
Subcontractors
0
Drums managed
0 +

Challenges Encountered

Lack of Visibility

Difficulty tracking inventory due to disparate reporting methods used by subcontractors.

Time-consuming Management

Manually consolidating data from multiple spreadsheets.

Overstock

Excess orders due to a lack of visibility into available cable lengths.

High costs

Resulting from unused remaining cable lengths on drums

QR-DRUM solution

Cable reporting on site for stock and deployment through a user friendly App.

Drum localisation and tracking through a simple scan with a smartphone & logistical reporting available at any time for the logistical team via a Web platform (stocks & deployed cable lengths)

QR-DRUM outcomes

Reduced deployment costs:

• Reduced cable waste through better use of remaining lengths, thus improving the environmental footprint.

• Reduced surplus at the end of the project.

Optimised transportation and inventory management.

• Optimised deployment management through more efficient resource allocation.

• Accurate and transparent inventory management with subcontractors.

• Enhanced reliability of requirements for future projects.

Considerable time savings on inventories and field reporting.

• Real-time reporting: Digital and standardised inventory management via the cloud, accessible at any time.

• Intuitive application: A simplified interface for efficient monitoring in the field.

• Reduced subcontractor inventory verification time from one full day per week to just 2.,5 hours.

Verifiable results

savings on cable cost
- 0 %

1,5 to 2M €

saved on the project

time saved on inventory management and reporting
- 0 %

Introductory Offer: Try QR-DRUM now!

Take advantage of our introductory offer and see your savings within the first 3 months.
Contact us today for a demonstration and discover how QR-DRUM can transform your cable management!

QR-Drum: A solution to improve the logistical, economic and environmental performance of your cable deployments